
The cheapest machine can be the furthest away.
Mobilisation is time, route, permits, float availability and uncertainty. Ask where the proposed unit is coming from—not only whether the business services your postcode.
Map the real origin
A provider may operate nationally while an individual asset sits interstate. Request the machine origin and expected travel method for the quoted dates.
Check the last kilometre
Bridge limits, low wires, tight turns, school zones and gate geometry can undo a good highway plan at the site boundary.
Price the return journey
Demobilisation, waiting time, failed access and after-hours delivery can materially change cost. Put the complete movement basis in writing.
Put the signal into a service plan.
OPEN DISPATCH BOARD ↗MORE FIELD SIGNALS ↗Make the next decision with confidence.
Compare plant hire quotes on the whole job
Build a like-for-like comparison of hire, transport, operating hours, attachments and collection before choosing a supplier.
Read the guide Equipment selection · Practical guideWet hire or dry hire: choose the service you need
Understand operator inclusion, site coordination and the questions to resolve when comparing wet and dry plant hire.
Read the guide Mobilisation · Practical guidePrepare the site for plant delivery
Give the transport team useful access information, an arrival contact and a practical unloading plan before dispatch.
Read the guide