Availability is not the same as readiness.

A machine is project-ready only when specification, operator, transport, attachments, paperwork and support all align.

01

Confirm the exact unit

Model, operating weight, configuration and attachments affect transport and performance. Avoid planning around a generic class alone.

02

Name the fallback

Ask how breakdown support works, where technicians are based and whether a replacement pathway exists for critical activities.

03

Close the documentation gap

Inductions, SWMS, licences, inspection records and site-specific requirements should be checked before the mobilisation clock starts.