Availability is not the same as readiness.
A machine is project-ready only when specification, operator, transport, attachments, paperwork and support all align.
Confirm the exact unit
Model, operating weight, configuration and attachments affect transport and performance. Avoid planning around a generic class alone.
Name the fallback
Ask how breakdown support works, where technicians are based and whether a replacement pathway exists for critical activities.
Close the documentation gap
Inductions, SWMS, licences, inspection records and site-specific requirements should be checked before the mobilisation clock starts.
Put the signal into a service plan.
OPEN DISPATCH BOARD ↗MORE FIELD SIGNALS ↗Make the next decision with confidence.
Compare plant hire quotes on the whole job
Build a like-for-like comparison of hire, transport, operating hours, attachments and collection before choosing a supplier.
Read the guide Equipment selection · Practical guideWet hire or dry hire: choose the service you need
Understand operator inclusion, site coordination and the questions to resolve when comparing wet and dry plant hire.
Read the guide Mobilisation · Practical guidePrepare the site for plant delivery
Give the transport team useful access information, an arrival contact and a practical unloading plan before dispatch.
Read the guide